Our Projects

Low-Risk Window Removal – University of Alberta Hospital

PHOTO-2026-01-03-18-50-39

About Project

OC Environmental LTD was contracted to perform low-risk abatement during the removal of exterior and interior windows at a hospital facility. Due to the sensitive nature of an active healthcare environment, strict safety controls and coordination were required.

Scope of Work
  • Low-risk abatement preparation
  • Controlled removal of existing windows
  • Dust control and containment
  • Safe handling and disposal of materials
  • Continuous site cleanliness and monitoring
Challenges
  • Active hospital operations
  • Noise and dust restrictions
  • Strict scheduling requirements

Results

The work was completed safely with minimal disruption to hospital staff and patients. All areas were left clean and ready for installation of new window systems.

Project Information

Category:

Low-Risk Abatement / Selective Removal

Client:

University of Alberta Hospital Facilities Management

Location:

Edmonton, Alberta

Rating

image

High-Risk Stucco Abatement – The King’s University

PHOTO-2026-01-03-18-49-43

About Project

This project involved high-risk abatement and removal of stucco materials containing hazardous components. OC Environmental LTD implemented full containment and safety procedures to ensure compliance and protection of surrounding campus facilities.

Scope of Work
  • High-risk hazard assessment
  • Full containment setup
  • Removal of stucco materials
  • Controlled disposal of hazardous waste
  • Final site cleaning and clearance
Challenges
  • Campus environment with pedestrian traffic
  • Weather-related scheduling constraints
  • Strict compliance requirements

Results

The project was completed safely and in compliance with all regulations, allowing exterior renovation work to proceed without delays.

Project Information

Category:

High-Risk Abatement / Hazardous Material Removal

Client:

The King’s University Facilities Department

Location:

Edmonton, Alberta

Rating

image

High-Risk Abatement Project – Red Deer Regional Hospital

High-Risk Abatement Project

About Project

OC Environmental LTD was engaged to conduct high-risk abatement.

Scope of Work
  • High-risk abatement planning and setup
  • Containment and negative air systems
  • Removal of hazardous materials
  • Safe packaging and disposal
  • Final clearance
Challenges
  • Tight work schedules

Results

All abatement work was completed with no safety incidents.

Project Information

Category:

High-Risk Abatement / Hazardous Material Removal

Client:

Red Deer Regional Hospital Centre

Location:

Red Deer, Alberta

Rating

image

Interior Clean Demolition – TD Bank Branch

PHOTO-2026-01-03-18-47-35 (1)

About Project

OC Environmental LTD performed clean interior demolition for a TD Bank branch renovation. The focus was on precision, dust control, and maintaining a clean and professional environment suitable for financial facilities.

Scope of Work
  • Interior selective demolition
  • Removal of fixtures, partitions, and finishes
  • Dust suppression and site cleanliness
  • Waste handling and disposal
  • Preparation for renovation trades
Challenges
  • Brand-sensitive environment
  • Tight renovation timeline
  • Cleanliness and noise control

Results

The site was delivered on schedule, clean, and fully ready for renovation, meeting the client’s strict operational standards.

Project Information

Category:

Clean Demolition / Selective Demolition

Client:

TD Bank Group

Location:

Alberta

Rating

image

High-Risk Vermiculite Removal – Westlock Arena

PHOTO-2026-01-03-18-43-45

About Project

This project involved the removal of vermiculite insulation identified as a high-risk material. OC Environmental LTD implemented full containment and specialized handling to ensure safe removal in a public facility.

Scope of Work
  • Vermiculite hazard assessment
  • High-risk containment setup
  • Safe removal of vermiculite insulation
  • Approved disposal methods
  • Final cleanup and clearance
Challenges
  • Large open arena space
  • Public safety requirements
  • Specialized handling procedures

Results

The arena was cleared safely and approved for further upgrades, with all hazardous materials removed according to regulations.

Project Information

Category:

High-Risk Abatement / Vermiculite Removal

Client:

Town of Westlock Facilities Department

Location:

Westlock, Alberta

Rating

image

High-Risk Abatement Project – University of Alberta

PHOTO-2026-01-03-18-42-56

About Project

OC Environmental LTD completed a high-risk abatement project within a university facility, requiring strict coordination, safety planning, and adherence to institutional guidelines.

Scope of Work
  • High-risk abatement planning
  • Full containment and negative air systems
  • Removal of hazardous building materials
  • Safe transport and disposal
  • Final clearance and documentation
Challenges
  • Active academic environment
  • Coordination with multiple departments
  • Strict compliance and safety protocols

Results

The project was completed successfully, enabling ongoing renovations while maintaining safety across campus.

Project Information

Category:

High-Risk Abatement / Hazardous Material Removal

Client:

University of Alberta Infrastructure & Operations

Location:

Edmonton, Alberta

Rating